Skyhawk Electrical System

Skyhawks utilized a constant speed generator mounted to the front of the engine. The electrical system requirements were three phase 400 Hertz 115/200VAC, and 28VDC.


Generator image courtesy of Ray "Dutchy" Brauer of the RAN.

A deployed "RAT". (Ram Air Turbine); for emergency electrical power. This bird is BuNo 147733 being reassembled for restoration and display at the Fort Worth Meacham International Airport Veterans Memorial Air Park, in August 2007.

147715a18.jpg

 

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer